Introduction
Pre-works roost structure
- Photos or annotated figures of roost structure
Pre-works roost description
- Roost material(s)
-
- Photos or annotated figures of roost
Proposed works
- Relevant annotated figures
Proposed mitigations
- Type of mitigation
- Mitigation
- Specific technical detail of measure
- Time key works to fall outside maternity period.
Make sure new roof is the same height above wall top as old roost.
Retain sufficient flight space internally.
- Relevant annotated figures
- Roost location
- Other
- Aspect of roost
- W
- Height of roost entrance (m)
- 4
- Roost material(s)
-
- Breezeblock / Concrete
- Nearest commuting feature
- Hedge
- Distance to nearest commuting feature (m)
- 1
- Nearest artificial light source to roost
- Strip lights within stables but only used when needed.
- Photos or annotated figures of roost
Monitoring data
- Type of monitoring
- Dusk and Dawn Survey
- Date and time
- 20th June 2024 22:00
- Evidence recorded
- 23 brown long-eared bats emerged
- Interventions made
- None
- Type of monitoring
- Dusk and Dawn Survey
- Date and time
- 14th August 2024 22:00
- Evidence recorded
- 29 brown long-eared bats emerged
- Interventions made
- None
- Photos or annotated figures